Final | 3/12/2007 | 3/12/2007 | 3/12/2007 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
MEC-Aging Inspection | 3/12/2007 | 3/12/2007 | 3/12/2007 | | PASS |
Dixie Fellows
|
|
|
troy passed this job..i'm not sure why it doesn't show it as such, i rescheduled it again and it should final it..thanks dixie
|
Conference | 1/8/2007 | 1/9/2007 | 1/9/2007 | A | PEND |
Dixie Fellows
|
|
|
call bob and debest..still waiting for word from rita or contractor, if the problems have been corrected..dixie
|
Conference | 1/8/2007 | 1/8/2007 | 1/9/2007 | P | PEND |
Dixie Fellows
|
|
|
call bob regarding this job..called bob and spoke with him regarding permits being grouped to wrong bldg permits..he will call lisa at ymc and i will call rita to have this fixed..
|
MEC-Aging Inspection | 1/8/2007 | 1/8/2007 | 1/8/2007 | | PASS |
Dixie Fellows
|
|
|
wip..this permit was re-opened and i scheduled this for a conference with bob due to some questions about above ceiling return air plenum and the rating on some wires, etc dixie
|
Final | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/9/2006 at 1:48:11 PM. Contact: ###-####.
|
Rough-in | 1/17/2006 | 1/18/2006 | 1/18/2006 | A | PASS |
Dixie Fellows
|
|
|
bob ###-####...ok to cover..will check s/f damper at final
|
Rough-in | 1/13/2006 | 1/17/2006 | 1/17/2006 | A | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/13/2006 at 4:41:03 PM. Contact: ###-####...i rescheduled this for wed am..i will meet bob at 8:30
|