Final | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 12:02:50 PM. Contact: ###-####.
|
Final | 2/15/2006 | 2/16/2006 | 2/16/2006 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/15/2006 at 3:34:35 PM. Contact: ###-####....flue and reg need to be 10' from fresh air intake on a rtu...gas flex connector to be 1/2" i.d.
|
Rough-in | 1/17/2006 | 1/18/2006 | 1/18/2006 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/17/2006 at 3:26:53 PM. Contact: ###-####...ok to cover..will check duct detectors, condensates, etc at final
|
Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | PEND |
Dixie Fellows
|
|
|
mike ###-####..unable to meet..contractor will reschedule for wed am at 9:30
|