Final | 5/10/2006 | 5/11/2006 | 5/11/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 3:17:34 PM. Contact: ###-####.
|
Rough-in | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 3:18:17 PM. Contact: ###-####.
|
Rough-in | 3/1/2006 | 3/1/2006 | 3/1/2006 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/22/2006 at 11:18:33 AM. Contact: ###-####. framing at exterior wall flue penetration too small, 11" min. i.d.
|