Final | 4/18/2006 | 4/19/2006 | 4/19/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 4/18/2006 at 11:31:25 AM. Contact: ###-####.
|
Final | 4/4/2006 | 4/5/2006 | 4/5/2006 | A | FAIL |
Alan Hauser
|
|
|
6" clearance at single wall flue connector
|
Pressure Test | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 2:30:02 PM. Contact: ###-####.
|
Rough-in | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/2/2006 at 2:29:45 PM. Contact: ###-####.
|