Final | 6/12/2006 | 6/13/2006 | 6/13/2006 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/12/2006 at 3:52:06 PM. Contact: ###-####.
|
Rough-in | 4/12/2006 | 4/13/2006 | 4/13/2006 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 4/11/2006 | 4/12/2006 | 4/12/2006 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 4/10/2006 | 4/11/2006 | 4/11/2006 | A | NR |
Bill VanDegrift
|
|
|
builder moved attic access instead of building catwalk; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 4/7/2006 | 4/10/2006 | 4/10/2006 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 4/7/2006 | 4/10/2006 | 4/10/2006 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS...called april
|