Final | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
Final | 8/2/2006 | 8/3/2006 | 8/3/2006 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans..waiting for gas contractor to complete his side of job
|
Final | 8/2/2006 | 8/2/2006 | 8/2/2006 | P | FAIL |
Dixie Fellows
|
|
|
2381 george
|
Final | 8/1/2006 | 8/2/2006 | 8/2/2006 | A | FAIL |
Dixie Fellows
|
|
|
###-####...call when going out...complete condensate drains at rtu's per plan..need 1/2" i.d. gas flex connectors to 3- rtu's
|
Final | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | PART |
Dixie Fellows
|
|
|
Call when going out there thank you; Phone #: ###-#### Internet Inspection Request from: misty evans..ok to cover ceiling tiles except at diffusers..i rescheduled this for wed am at 10:00, if lonnie can meet me there to correct any issues..thanks dixie
|
Final | 7/28/2006 | 7/31/2006 | 7/31/2006 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans..please reschedule for tues am..have somebody call and set up a time to meet me..thanks dixie
|
Rough-in | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | FAIL |
Dixie Fellows
|
|
|
added new system; Phone #: ###-#### Internet Inspection Request from: misty evans..need to group this to the correct bldg permit
|
Rough-in | 6/5/2006 | 6/6/2006 | 6/6/2006 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans
|
Rough-in | 6/5/2006 | 6/5/2006 | 6/5/2006 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans...no call back to complete inspection..called lonnie
|
Rough-in | 6/5/2006 | 6/5/2006 | 6/5/2006 | A | PART |
Dixie Fellows
|
|
|
6/05/06 - morning insp per dixie//blb...holes all sealed in upper portion of ducts that were screwed to the rafters..ducts are now strapped with 24guage metal..will re-check duct after lower sections are attached
|
Rough-in | 6/1/2006 | 6/2/2006 | 6/2/2006 | A | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans...out of time..called russ to reschedule
|
Rough-in | 6/1/2006 | 6/1/2006 | 6/1/2006 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans..i need lonnie to call me with issues on this job..thanks dixie
|
Rough-in | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans..talked with russ about some corrections..i need to call steve bastian the engineer regarding some issues..i will let you know what i find out.
|
Conference | 5/26/2006 | 5/26/2006 | 5/26/2006 | P | DEFR |
Dixie Fellows
|
|
|
Downstairs ready for drywall?; Phone #: ###-#### Internet Inspection Request from: misty evans..out of tjme..reschedule for tues and put phone # of contact for conference in the notes..thanks dixie
|