Final | 7/7/2006 | 7/7/2006 | 7/7/2006 | P | PASS |
Troy James
|
|
|
braxton; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Pressure Test | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/4/2006 at 11:01:35 AM. Contact: ###-####.
|
Rough-in | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/4/2006 at 11:01:18 AM. Contact: ###-####.
|