Final | 7/6/2007 | 7/6/2007 | 7/6/2007 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/6/2007 at 12:34:32 AM.
|
Pressure Test | 8/31/2006 | 8/31/2006 | 8/31/2006 | P | PASS |
Alan Hauser
|
|
|
###-#### scott
|
Pressure Test | 8/30/2006 | 8/31/2006 | 8/31/2006 | A | NR |
Dixie Fellows
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..need the test to set a little longer..rescheduled for pm
|
Rough-in | 8/3/2006 | 8/3/2006 | 8/3/2006 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/3/2006 at 10:52:25 AM. Contact: ###-####....r/i ok..gas n/r
|
Rough-in | 8/2/2006 | 8/2/2006 | 8/2/2006 | P | FAIL |
Dixie Fellows
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|