Final | 7/3/2006 | 7/5/2006 | 7/5/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/3/2006 at 4:47:00 PM. Contact: ###-####.
|
Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Troy James
|
|
|
|
Rough-in | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 10:50:07 AM. Contact: ###-####. insulate duct in garage and complete duct installation at living room
|
Pressure Test | 5/26/2006 | 5/30/2006 | 5/30/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 5/26/2006 at 10:50:27 AM. Contact: ###-####.
|