Final | 9/21/2006 | 9/21/2006 | 9/21/2006 | P | PASS |
Troy James
|
|
|
|
Rough-in | 9/13/2006 | 9/14/2006 | 9/18/2006 | A | PASS |
Troy James
|
|
|
Mark - Cover Inspection; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen t-bar ceiling ok, conf on final
|
Rough-in | 8/30/2006 | 8/30/2006 | 8/30/2006 | P | PASS |
Troy James
|
|
|
grease ductwrap ok
|
Final | 8/29/2006 | 8/29/2006 | 8/30/2006 | P | PASS |
Troy James
|
|
|
first layer of firewrap ok (This activity was added in error so we have changed the case status back to Issued.)
|
Rough-in | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Troy James
|
|
|
grease duct inspection ok to install first layer of grease wrap
|
Final | 8/24/2006 | 8/24/2006 | 8/24/2006 | P | PASS |
Troy James
|
|
|
grease duct inspection ok to continue (This activity was added in error so we have changed the case status back to Issued.) rough in only finaled by mistake
|
Rough-in | 8/23/2006 | 8/23/2006 | 8/23/2006 | P | FAIL |
Troy James
|
|
|
Inspect Welded Duct; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen grease duct required to be built so that grease will drain back to filters, two additional grease duct cleanout doors required
|
Rough-in | 8/8/2006 | 8/11/2006 | 8/11/2006 | A | PASS |
Troy James
|
|
|
fire wrap inspection; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen second layer ok
|
Conference | 8/10/2006 | 8/10/2006 | 8/10/2006 | P | PASS |
Troy James
|
|
|
Grease Duct Fire Wrap First Layer Inspection; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Rough-in | 8/8/2006 | 8/9/2006 | 8/9/2006 | A | PASS |
Troy James
|
|
|
inspect chase / fire wrap; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen grease duct welds ok to insulate first layer
|
Rough-in | 8/7/2006 | 8/8/2006 | 8/8/2006 | A | PASS |
Troy James
|
|
|
Partial - chase inspection - mark; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen duct through north shaft ok to cover
|
Rough-in | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Troy James
|
|
|
Cover Inspection for Hardlids; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen ok to cover hard lid ceilings and walls
|
Conference | 6/19/2006 | 6/21/2006 | 6/21/2006 | A | DONE |
Troy James
|
|
|
Conference w/ engineer, architect, Datum Const. 9:00am. Jim Storey requested to be informed so that he could participate.; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
|
Conference | 6/15/2006 | 6/15/2006 | 6/15/2006 | P | DONE |
Troy James
|
|
|
meet at 1:30pm
|
Conference | 6/14/2006 | 6/15/2006 | 6/15/2006 | A | CANC |
Troy James
|
|
|
Conference - Mark Hammer; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen nobody on site
|