Final | 12/5/2006 | 12/5/2006 | 12/5/2006 | P | PASS |
Dixie Fellows
|
|
|
elisa ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..thanks for the picture..dixie
|
Final | 11/30/2006 | 11/30/2006 | 12/1/2006 | P | FAIL |
Dixie Fellows
|
|
|
elisa; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..flue and comb air intake not per manufacturer
|
Final | 11/28/2006 | 11/29/2006 | 11/29/2006 | A | FAIL |
Dixie Fellows
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..furnace flue location and comb air opening..not per manuf.. .read the book.. .gas flex connector to furnace undersized..posted on furnace
|
Rough-in | 7/12/2006 | 7/13/2006 | 7/13/2006 | A | PASS |
Dixie Fellows
|
|
|
steve ###-####
|
Rough-in | 7/12/2006 | 7/12/2006 | 7/12/2006 | P | CANC |
Dixie Fellows
|
|
|
###-####..out of time..i rescheduled this for thurs am for the contractor
|
Final | 7/11/2006 | 7/11/2006 | 7/12/2006 | P | NR |
Dixie Fellows
|
|
|
should be a r/i
|
Final | 7/11/2006 | 7/11/2006 | 7/12/2006 | P | NR |
Dixie Fellows
|
|
|
ok per Dixie for this afternoon///dld
|
Rough-in | 7/1/2006 | 7/3/2006 | 7/3/2006 | A | FAIL |
Alan Hauser
|
|
|
corrections not completed
|
Final | 6/30/2006 | 6/30/2006 | 7/1/2006 | P | PEND |
Dixie Fellows
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..this should have been a r/i and gas test...i rescheduled this for mon am
|
Rough-in | 6/28/2006 | 6/29/2006 | 6/29/2006 | A | PART |
Dixie Fellows
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..GAS OK..R/I FAILED..NEED 1" CLEARANCE FROM B-VENT TO ROOF..TAPE JOINTS ON R/A AND SUPPLY IN CHASE WITH B-VENT..WRAP PINK BATTING WITH TAPE OR PANDUIT AND INSULATE METAL IN ATTIC.
|