Final | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PASS |
Troy James
|
|
|
|
Rough-in | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/17/2006 at 6:35:21 PM. Contact: ###-####.
|
Pressure Test | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/17/2006 at 6:34:49 PM. Contact: ###-####.
|
Pressure Test | 7/11/2006 | 7/12/2006 | 7/12/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:15:56 AM. Contact: ###-####.
|
Rough-in | 7/11/2006 | 7/12/2006 | 7/12/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 7/11/2006 at 11:15:42 AM. Contact: ###-####. revise permit to show two furnaces and two air conditioners, gas test failed, need two foot wide platform from attic access to furnace
|