Rough-in | 7/13/2006 | 7/14/2006 | 7/14/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/13/2006 at 6:33:03 PM. Contact: ###-####.
|
Rough-in | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | FAIL |
Alan Hauser
|
|
|
insulate metal elbows above furnace
|
Pressure Test | 7/11/2006 | 7/11/2006 | 7/11/2006 | P | PASS |
Alan Hauser
|
|
|
jake ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|