Final | 11/14/2006 | 11/14/2006 | 11/14/2006 | P | PASS |
Bill VanDegrift
|
|
|
call 1st
|
Final | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | NH |
Bill VanDegrift
|
|
|
###-#### ROBERE...CALL 1ST FOR ACCESS INFORMATION changed to pm
|
Final | 11/13/2006 | 11/13/2006 | 11/13/2006 | P | PEND |
Dixie Fellows
|
|
|
robere ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..INSPECTOR MEETING..OUT OF TIME..I RESCHEDULED THIS FOR TUES AM..THANKS DIXIE
|
Rough-in | 7/27/2006 | 7/27/2006 | 7/27/2006 | P | PASS |
Dixie Fellows
|
|
|
robere - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Pressure Test | 7/27/2006 | 7/27/2006 | 7/27/2006 | P | PASS |
Dixie Fellows
|
|
|
robere - call prior to insp; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
Conference | 7/25/2006 | 7/25/2006 | 7/25/2006 | P | PART |
Bill VanDegrift
|
|
|
use approved duct at all exhaust fand, use 30 psi guage and 20 psi test on gas, insulate supply fittings and plenum in attic and vapor berrior. gas flex to furnace is needs to supply 75,000 btus.
|