Final | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/17/2006 at 7:09:16 AM. Contact: ###-####.
|
Final | 10/31/2006 | 11/1/2006 | 11/1/2006 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/31/2006 at 1:15:44 PM. Contact: ###-####. elbow on air intake
|
Final | 9/15/2006 | 9/18/2006 | 9/19/2006 | P | PASS |
Troy James
|
|
|
jeanne; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles cancelled 2:10 pm (This activity was added in error so we have changed the case status back to Issued.)
|
Pressure Test | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/21/2006 at 3:21:10 PM. Contact: ###-####.
|
Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/21/2006 at 3:20:35 PM. Contact: ###-####.
|
Pressure Test | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | FAIL |
Troy James
|
|
|
need sizing verified
|
Rough-in | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | FAIL |
Troy James
|
|
|
jeannine; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley gas sizing needs to be verified as correct size, hangers required at gas piping
|
Pressure Test | 7/20/2006 | 7/20/2006 | 7/20/2006 | P | CANC |
Troy James
|
|
|
jeannine; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley rescheduled for friday morning
|