Final | 4/13/2007 | 4/16/2007 | 4/16/2007 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/13/2007 at 10:46:22 AM. Contact: ###-####.
|
Final | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | NR |
Dixie Fellows
|
|
|
1:00 Stan ###-####..unable to final job until all mech contractors are ready..i walked the job with stan and all is ok..
|
Final | 3/13/2007 | 3/14/2007 | 3/13/2007 | A | PEND |
Dixie Fellows
|
|
|
Phone #: ###-####..called stan and asked him to reschedule for pm, as i will be out of the office in the am..thanks dixie
|
MEC-Aging Inspection | 2/28/2007 | 2/28/2007 | 2/28/2007 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 12/28/2006 | 12/29/2006 | 12/29/2006 | A | PART |
Dixie Fellows
|
|
|
###-####..ok to cover..talked with stan regarding a couple items..he will take care of them and i will check the next inspection
|
Rough-in | 12/27/2006 | 12/28/2006 | 12/28/2006 | A | CANC |
Dixie Fellows
|
|
|
TML onsite foreman Stan lillquest ###-####; Phone #: ###-#### x189 Internet Inspection Request from: Steve Tow..i called stan and steve and left them both a message..i rescheduled this for fri am..thanks dixie
|
MEC-Aging Inspection | 11/28/2006 | 11/28/2006 | 11/30/2006 | | PASS |
Dixie Fellows
|
|
|
|
MEC-Aging Inspection | 9/28/2006 | 9/28/2006 | 9/28/2006 | | PASS |
Dixie Fellows
|
|
|
work still in progress per g/c
|
Conference | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/25/2006 at 4:04:53 PM. Contact: ###-####...discussed grease duct, shaft, hood, duct wrap, etc
|
Conference | 7/24/2006 | 7/25/2006 | 7/25/2006 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/24/2006 at 2:21:04 PM. Contact: ###-####...talked with contractors and stan will reschedule for wed am at 9:30
|