Final | 5/29/2007 | 5/29/2007 | 5/29/2007 | P | PASS |
Troy James
|
|
|
chris ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Final | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | NR |
Lee Rice
|
|
|
chris; cell ####-#### call before Phone Internet Inspection Request from: Cathy Chiles
|
Rough-in | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | PASS |
Troy James
|
|
|
chris - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith hydronic test ok, need to add hydronics to permit
|
Rough-in | 11/7/2006 | 11/7/2006 | 11/7/2006 | P | PASS |
Troy James
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
Rough-in | 11/1/2006 | 11/2/2006 | 11/2/2006 | A | PART |
Troy James
|
|
|
chris ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover insulation shield to flue, platform to furnace in attic, gas piping needs to be completed to boiler, add hydronics, boiler, gas piping, furnace to permit
|