Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberMEC06-02748
StatusFinaled
Name FM INC
Site Address 1111 W JEFFERSON ST
Project NameBoise Cascade Building
Customer Number 
ePlanReview 
Description
stairwell pressurization system, ductwork, registers, air balance per initial cert of b=value $382,600.00 ///Final value is $387,348//5/20/08 LEG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/19/20082/20/20082/20/2008APASS
DetailsBill VanDegrift
need all three floors finaled. needs to have a thread to the BLD-07-02244 permit that was pulled out on a 3rd floor T.I. so Boise cascade can get occupancy in that area.
Call Mike ###-#### Internet Inspection Request from: Greg Fannin signed card
Final2/18/20082/19/20082/19/2008AFAIL
DetailsDixie Fellows
Need final for all areas of 1st,2nd and 3rd floors,problem with permit boise cascade took out for part of 3rd floor not linked to this permit and he cannot get his occupancy. See Mike at ###-#### to resolve this. Phone #: ###-#### Internet Inspection Request from: Greg Fannin...no card on site
Rough-in12/20/200712/21/200712/21/2007APASS
DetailsTroy James
Need rough in for 3rd floor southwest.
Call Mike at ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in11/23/200711/26/200711/26/2007APASS
DetailsTroy James
need inspection for 3rd floor NW. Call Mike
###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in10/24/200710/25/200710/25/2007APART
DetailsTroy James
need rough in for 3rd floor NE quad.
Call Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
ok to cover
Rough-in10/5/200710/8/200710/8/2007APASS
DetailsDixie Fellows
need rough in for 3rd floor south east quad.
Call Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
MEC-Aging Inspection9/26/20079/26/20079/26/2007 PASS
DetailsDixie Fellows
wip
Final7/20/20077/23/20077/23/2007APASS
DetailsDixie Fellows
Need final for Audio Visual room on first floor . Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in7/20/20077/23/20077/23/2007APASS
DetailsDixie Fellows
Need rough in for 1st floor South west quadrant. Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in6/20/20076/21/20076/21/2007APASS
DetailsDixie Fellows
need rough in for 1st floor northwest 2nd half rough in. Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in6/5/20076/5/20076/6/2007PPART
DetailsDixie Fellows
jamie - 1st floor 1/2 of quad 3; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Rough-in5/11/20075/11/20075/11/2007APART
DetailsDixie Fellows
need rough in for 1st floor NE quad.
See mike. ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin..ok to cover this section
Rough-in4/25/20074/26/20074/26/2007APART
DetailsDixie Fellows
need rough in for 1st floor SE quadrant.
Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Greg Fannin...###-####
Rough-in3/15/20073/16/20073/16/2007APART
DetailsDixie Fellows
Need inspection of fire wrap on stairwell ventilation duct. Call Kelly of trinity insulation ###-#### to arrange to meet him at jobsite Phone #: ###-####...all fire wrap on stairwell ducts ok..nice job
Rough-in1/10/20071/12/20071/12/2007APART
DetailsDixie Fellows
Need rough in on penthouse fans
meet mike ###-#### Phone #: ###-####..looked at fans and discussed fire wrap issues, etc..did the engineer call for detectors?
Rough-in11/20/200611/21/200611/21/2006APASS
DetailsDixie Fellows
Need rough in for cover on 2nd floor SW corner. Call Mike at ###-####; Phone #: ###-#### Internet Inspection Request from: Greg Fannin...some existing duct not approved by this code was used..(air connector)
Rough-in10/26/200610/27/200610/27/2006APART
DetailsDixie Fellows
ok to cover this section
Rough-in10/25/200610/26/200610/26/2006ACANC
DetailsDixie Fellows
need partial rough-in for 2nd floor 3rd core. Mike ###-####; Phone #: ###-#### Internet Inspection Request from: Greg Fannin
Rough-in10/2/200610/3/200610/3/2006APART
DetailsDixie Fellows
###-####..OK TO COVER THIS SECTION
Rough-in9/29/200610/2/200610/2/2006APEND
DetailsDixie Fellows
Need partial roughin for cover. 2nd floor NE quadrant. Please call Mike ###-#### ; Phone #: ###-#### Internet Inspection Request from: Greg Fannin..unable to meet up with mike today..i called him and told him i rescheduled this for tues am..thanks
Rough-in9/14/20069/15/20069/15/2006APART
DetailsDixie Fellows
###-#### mike..ok to cover this section
Rough-in9/14/20069/14/20069/14/2006ACANC
DetailsDixie Fellows
###-#### mike..out of time so i rescheduled this for fri am..thanks dixie
Conference9/13/20069/14/20069/14/2006APASS
DetailsDixie Fellows
need partial final on second floor S.E. corner. Please call Mike at ###-#### and he will meet you.; Phone #: ###-#### Internet Inspection Request from: Greg Fannin..this should have been scheduled for a r/i, so i sent it back to myself for one. dixie
Rough-in9/11/20069/12/20069/12/2006AFAIL
DetailsDixie Fellows
Need partial cover on 2nd floor S.E. quadrant. Please call Mike at ###-#### to schedule meeting him at the jobsite.; Phone #: ###-#### Internet Inspection Request from: Greg Fannin..talked to mike about cleaning up flex duct drops into diffusers as per manuf specs..he will recall when ready