Final | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PASS |
Dixie Fellows
|
|
|
###-####..make this the 1st inspection on tues am
|
Final | 12/4/2006 | 12/4/2006 | 12/4/2006 | A | PEND |
Dixie Fellows
|
|
|
mike - re-inspection ; Phone #: ###-####..mike i rescheduled this for tues am..tell the builder he can call his final as i will be there before the structural inspector..thanks dixie
|
Final | 12/4/2006 | 12/4/2006 | 12/4/2006 | P | NR |
Dixie Fellows
|
|
|
mike - re-inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..need to have a conference with the installer
|
Final | 12/1/2006 | 12/1/2006 | 12/1/2006 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 9:55:08 AM. Contact: ###-####. provide combustion air for water heater, 100 sq in min upper and lower, pipi secondary drain to exterior.
|
Rough-in | 9/18/2006 | 9/19/2006 | 9/19/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 11:55:20 AM. Contact: ###-####.
|
Pressure Test | 9/19/2006 | 9/19/2006 | 9/19/2006 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/18/2006 at 11:55:20 AM. Contact: ###-####. 20# gas test ok by dix
|
Rough-in | 9/12/2006 | 9/12/2006 | 9/13/2006 | P | FAIL |
Dixie Fellows
|
|
|
Thanks; Phone #: ###-#### Internet Inspection Request from: Kerry Draper..all corrections not done. you will have to replace section of z-vent with screws in it unless manufacturer says otherwise.
|
Pressure Test | 9/11/2006 | 9/11/2006 | 9/11/2006 | P | PASS |
Dixie Fellows
|
|
|
20LB OK
|
Rough-in | 9/8/2006 | 9/11/2006 | 9/11/2006 | A | FAIL |
Dixie Fellows
|
|
|
rough-in insnpection. Thanks; Phone #: ###-#### Internet Inspection Request from: Kerry Draper..POSTED CORR ON WINDOW
|