Rough-in | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PART |
Lee Rice
|
|
|
meet at 1:00 assisted Dixie with rough-in
|
Rough-in | 11/17/2006 | 11/17/2006 | 11/17/2006 | A | FAIL |
Dixie Fellows
|
|
|
Jamie - ###-####
|
Rough-in | 10/4/2006 | 10/4/2006 | 10/4/2006 | P | NR |
Dixie Fellows
|
|
|
jamie; Phone #: ###-#### Internet Inspection Request from: Patricia Smith..CALLED CONTRACTOR. I NEED INSTALLER TO MEET ME ON THIS JOB..NEEDS TO SHOW ME LOCATION OF NEW DUCTWORK, ETC
|
Conference | 9/21/2006 | 9/22/2006 | 9/22/2006 | A | PASS |
Dixie Fellows
|
|
|
jd; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley..met with jd and discussed comb air, wood removed from supply's, r/a, etc
|
Rough-in | 9/14/2006 | 9/15/2006 | 9/16/2006 | A | FAIL |
Dixie Fellows
|
|
|
jd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..called jd to ask him if they are going to install the ductwork (supply, return, bath, range, dryer) etc for the job..no return call
|