Final | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PASS |
Dixie Fellows
|
|
|
final for occupancy
|
Final | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | PART |
Dixie Fellows
|
|
|
CONTACT: RYAN Phone #: ###-#### Internet Inspection Request from: JENN STALEY...will final when i final cox mechanicals permit
|
Rough-in | 2/21/2007 | 2/22/2007 | 2/22/2007 | P | PASS |
Dixie Fellows
|
|
|
JOB CONTACT: RYAN MITCHELL ####-#### Phone #: ###-####...20lb test from main to rtu's and inside ok
|
Rough-in | 2/20/2007 | 2/21/2007 | 2/21/2007 | P | PASS |
Dixie Fellows
|
|
|
JOB COHNTACT:RYAN M. Phone #: ###-####..20lb test from main at meter to root-tops and equip room ok
|
Pressure Test | 2/21/2007 | 2/21/2007 | 2/21/2007 | A | FAIL |
Dixie Fellows
|
|
|
this is the pressure test i did tues am..i pushed the wrong button and passed it. i went to the job and there was a leak. i talked to the worker on site about it..thanks dixie
|
Rough-in | 2/15/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Dixie Fellows
|
|
|
JOB CONTACT: RYAN Phone #: ###-####
|
MEC-Aging Inspection | 1/10/2007 | 1/10/2007 | 1/10/2007 | | PASS |
Dixie Fellows
|
|
|
wip
|
Conference | 9/29/2006 | 10/30/2006 | 10/30/2006 | A | PASS |
Dixie Fellows
|
|
|
will meet jason and bill at 10:30..not sure how this got scheduled, we already took care of this
|
Pressure Test | 10/5/2006 | 10/5/2006 | 10/5/2006 | P | PART |
Bill VanDegrift
|
|
|
per bill van field piping ok will test header after pour. pour at their own risk
|
Conference | 10/2/2006 | 10/2/2006 | 10/2/2006 | A | PASS |
Dixie Fellows
|
|
|
dixie mae ..met with bill and jason to discuss hydronics openings in concrete floors
|
Conference | 9/27/2006 | 9/29/2006 | 10/2/2006 | A | PASS |
Bill VanDegrift
|
|
|
meet Dixie and Jason on job site ###-#### 10:30am met with dix and the plumber about redesigned geo piping.
|
Conference | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PEND |
Dixie Fellows
|
|
|
meet Bill and Jason on job site ###-#### 10:30am..thanks to jason's patience we rescheduled for mon at 10:30..
|
Conference | 9/27/2006 | 9/28/2006 | 9/28/2006 | A | PEND |
Dixie Fellows
|
|
|
meet Bill V and Jason on job site...our schedules didn't work for us today.. i called jason and let him know i rescheduled this for fri am...10:30
|
Conference | 9/26/2006 | 9/27/2006 | 9/27/2006 | A | PEND |
Dixie Fellows
|
|
|
jayson - Phone # ###-####..rescheduled for thurs am
|