Final | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/21/2007 at 8:08:00 AM. Contact: ###-####.
|
Final | 2/28/2007 | 2/28/2007 | 2/28/2007 | A | FAIL |
Troy James
|
|
|
c/n posted on front door
|
MEC-Aging Inspection | 2/22/2007 | 2/22/2007 | 2/22/2007 | | PEND |
Troy James
|
|
|
called left message with contractor to schedule a final
|
Final | 12/14/2006 | 12/15/2006 | 12/15/2006 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/14/2006 at 3:30:57 PM. Contact: ###-####. contractor will reschedule for next week, talked to Gary
|
Pressure Test | 11/29/2006 | 11/29/2006 | 11/29/2006 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/29/2006 at 9:55:03 AM. Contact: ###-####. 60# test to unit north of building at roof
|
Pressure Test | 11/28/2006 | 11/29/2006 | 11/29/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/28/2006 at 1:28:08 PM. Contact: ###-####. need 60# test
|
Rough-in | 11/13/2006 | 11/14/2006 | 11/14/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 11/13/2006 at 4:06:34 PM. Contact: ###-####. pending boiler room
|
Rough-in | 9/28/2006 | 9/29/2006 | 9/29/2006 | A | PASS |
Troy James
|
|
|
gary - call prior to insp to meet there; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley 60# pressure test to existing rtu by chapel only at this time
|