Final | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PASS |
Troy James
|
|
|
Please inspect late afternoon. Thanks, April. Phone #: ###-####
|
Final | 3/12/2007 | 3/13/2007 | 3/13/2007 | P | CANC |
Troy James
|
|
|
Phone #: ###-#### Inspection cancelled from web by: April Sims
|
Final | 3/9/2007 | 3/12/2007 | 3/12/2007 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### shutoff valves at appliances are required to be installed upstream of sediment trap
|
Rough-in | 10/17/2006 | 10/18/2006 | 10/18/2006 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 10/16/2006 | 10/17/2006 | 10/17/2006 | A | FAIL |
Troy James
|
|
|
Please schedule for after 10 AM; Phone #: ###-#### Internet Inspection Request from: Rachael Ingham combustion air provided is undersized, need 8" minimum for 130,000 btu's
|
Rough-in | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS verify how you are providing combustion air to appliances at second level, show 8 bath exhaust fans to permit, 60# test ok
|
Pressure Test | 10/13/2006 | 10/16/2006 | 10/16/2006 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|