Final | 12/26/2006 | 12/28/2006 | 12/28/2006 | A | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Frank Marturello
|
Rough-in | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PASS |
Troy James
|
|
|
Re-inspection of the Rough In and Pressure Test.; Phone #: ###-#### Internet Inspection Request from: Frank Marturello 20# test
|
Rough-in | 10/4/2006 | 10/5/2006 | 10/5/2006 | A | FAIL |
Troy James
|
|
|
Rough in & pressure test. Please call ###-#### with any corrections. Thanks!; Phone #: ###-#### Internet Inspection Request from: Frank Marturello insulation shield to b-vent, seal duct second floor, lower combustion air at utility
|