Final | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | PASS |
Alan Hauser
|
|
|
|
Final | 7/1/2007 | 7/2/2007 | 7/2/2007 | P | PEND |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/1/2007 at 3:00:12 PM. Contact: ###-####.... called matt and ask him to reschedule due to correction notice from troy
|
Final | 6/6/2007 | 6/7/2007 | 6/7/2007 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 6/6/2007 at 12:32:44 PM. Contact: ###-####. insulate metal duct in crawl, see installation instructions for cook top in regards to combustible materials
|
Rough-in | 10/10/2006 | 10/11/2006 | 10/11/2006 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/10/2006 at 5:29:38 PM. Contact: ###-####. 20# test
|