Final | 10/25/2006 | 10/25/2006 | 10/25/2006 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/25/2006 at 7:13:26 AM. Contact: ###-####.
|
Final | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | NR |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 10/23/2006 at 8:57:14 PM. Contact: ###-####.
|
Rough-in | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | PART |
Alan Hauser
|
|
|
duct ok, need to turn exhaust duct around so laps go with air flow. ok for tile except where exhaust duct is
|
Rough-in | 10/9/2006 | 10/9/2006 | 10/9/2006 | P | PART |
Alan Hauser
|
|
|
duct sealed, ok to insulate, no other work done at this time
|