Final | 2/5/2007 | 2/6/2007 | 2/6/2007 | P | PASS |
Bill VanDegrift
|
|
|
final reinspect Phone #: ###-####
|
Final | 2/6/2007 | 2/6/2007 | 2/6/2007 | P | PASS |
Bill VanDegrift
|
|
|
|
Final | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | NR |
Bill VanDegrift
|
|
|
|
Final | 2/2/2007 | 2/5/2007 | 2/5/2007 | P | FAIL |
Bill VanDegrift
|
|
|
mechanical final please call me ###-#### Phone #: ###-#### b-vent with in 6" of ceiling. protection posts
|
MEC-Aging Inspection | 1/31/2007 | 1/31/2007 | 2/1/2007 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 11/30/2006 | 12/1/2006 | 12/1/2006 | P | PASS |
Dixie Fellows
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...bill checked the clearance around bw bent and approved the r/i
|
Rough-in | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | FAIL |
Lee Rice
|
|
|
with pressure test please this is a reinspection; Phone #: ###-#### Internet Inspection Request from: Calley Shartzer........Need 1 inch clearance for b-bw venting in and through walls per manufacturer specs.....correction posted
|
Pressure Test | 11/29/2006 | 11/30/2006 | 11/30/2006 | A | PART |
Lee Rice
|
|
|
with pressure test please this is a reinspection; Phone #: ###-#### Internet Inspection Request from: Calley Shartzer,,,,,Gas tests are ok but correction on clearances for b-bww vent has been posted.......1 inch minimum per manufacturer.
|