Conference | 11/9/2006 | 11/9/2006 | 11/9/2006 | P | PART |
Bill VanDegrift
|
|
|
met with keto heating about the combustion air for the 199,900btu instant water heater, the house isnt large enough for all air from inside and the owner didn't want a large hole from outside to the inside. keto wasnt responsible for the combustion air so they wouldnt fire it. told the owner not to fire it if there wasnt combustion air, told plumber the same. he was going to check into a direct vent model.
|
Final | 11/8/2006 | 11/9/2006 | 11/9/2006 | P | PART |
Bill VanDegrift
|
|
|
contact person is dave preston, pessure test and final; Phone #: ###-#### Internet Inspection Request from: PATRICK FLEMING 20# test ok needs combustion air prior to final.
|
Pressure Test | 10/31/2006 | 11/1/2006 | 11/1/2006 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/31/2006 at 1:43:23 PM. Contact: ###-####...I ASK DAVE IF I COULD DO THIS INPECTION WHEN I INSPECT THE TANKLESS W/H THE PLUMBER IS INSTALLING AND HE SAID THAT WAS FINE. I CALLED HORTENSE AND LET HER KNOW AS WELL. I WILL RESCHEDULE THIS TO MYSELF WHEN THE PLUMBER CALLS FOR HIS. I WILL LET YOU KNOW IF THERE ARE ANY PROBLEMS..THANKS DIXIE
|