Final | 3/8/2007 | 3/9/2007 | 3/9/2007 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 3:53:49 PM. Contact: ###-####.
|
Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | P | NR |
Dixie Fellows
|
|
|
Steve ###-####..not ready for a final..i will do the pressure test when the door is installed
|
Pressure Test | 2/23/2007 | 2/26/2007 | 2/26/2007 | P | FAIL |
Dixie Fellows
|
|
|
Steve ###-####..talked with home-owner and he will put a door between closet and bathroom due to w/h. they brought in a comb air above w/h
|
Final | 2/22/2007 | 2/23/2007 | 2/23/2007 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 2/22/2007 at 8:34:36 AM. Contact: ###-####. permit gas piping and venting for water heater in addition. combustion air may not be supplied from the bath room. test gas piping. call for inspection.
|
Rough-in | 11/20/2006 | 11/21/2006 | 11/21/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 4:29:35 PM. Contact: ###-####.
|