Final | 3/29/2007 | 3/29/2007 | 3/29/2007 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/29/2007 at 7:08:17 AM. Contact: ###-####.
|
Rough-in | 12/12/2006 | 12/12/2006 | 12/12/2006 | P | PASS |
Dixie Fellows
|
|
|
call kim to meet at job..corrections done..gas was ok on first inspection 20lb
|
Rough-in | 12/11/2006 | 12/12/2006 | 12/12/2006 | A | PEND |
Dixie Fellows
|
|
|
Jeff; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett..kim called to reschedule for this pm..i will call him to meet me at job..thanks dixie
|
Rough-in | 12/8/2006 | 12/8/2006 | 12/8/2006 | P | FAIL |
Dixie Fellows
|
|
|
PAM; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..posted corrections..need comb air..support dryer vent..seal r/a,,..20lb gas ok
|