Final | 3/16/2007 | 3/16/2007 | 3/16/2007 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/16/2007 at 7:50:56 AM. Contact: ###-####.
|
Final | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 4:59:12 PM. Contact: ###-####. previous c/n still not completed, reinspection fee is applied and must be paid before next inspection
|
Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/23/2007 at 8:42:41 AM. Contact: ###-####. need protection post in front of furnace
|
Rough-in | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/15/2006 at 10:06:30 AM. Contact: ###-####. insulation shield shall extend beyond the insulation height, exhaust fans need to be installed and inspected, what's the hurry
|
Pressure Test | 12/15/2006 | 12/18/2006 | 12/18/2006 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/15/2006 at 10:07:06 AM. Contact: ###-####.
|