Final | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### x4254
|
Final | 2/23/2007 | 2/26/2007 | 2/26/2007 | A | FAIL |
Troy James
|
|
|
Phone #: ###-#### seal line set termination, secondary drain cannot terminate on floor
|
Rough-in | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans previous c/n comment for flue still needs to be addressed
|
Pressure Test | 12/29/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Internet Inspection Request from: misty evans 20# test ok talked to them about combustion air, side wall vent termination. they will come up with an answer next week.
|