Final | 6/28/2007 | 6/29/2007 | 6/29/2007 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 6/28/2007 at 7:48:23 AM. Contact: ###-####. final ok with gas grill on back porch as a future fixture.
|
Rough-in | 2/7/2007 | 2/8/2007 | 2/8/2007 | A | PASS |
Troy James
|
|
|
kim - the house; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Rough-in | 2/6/2007 | 2/6/2007 | 2/6/2007 | A | FAIL |
Troy James
|
|
|
The reinspect R I will be on the House - the shop will also need a R.I. and Pressure Test still need to maintain 1" clearance with insulation shield, and need seperate permit for shop and attach to BLD for shop
|
Rough-in | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | FAIL |
Troy James
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall combustion air to water heater, insulation shield dropped to ceiling height and maintain 1" clearance around flue
|
Pressure Test | 2/2/2007 | 2/5/2007 | 2/5/2007 | A | PASS |
Troy James
|
|
|
kim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall 20# test
|