Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberMEC07-00088
StatusFinaled
Name TVR INC
Site Address 1112 W MAIN ST Unit: 4TH FLR
Project Name 
Customer Number 
ePlanReview 
Description
Mechanical Permit - New: heat pumps, fan coils, duct detector, exhaust, electric heaters, thermostats.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Rough-in11/28/200711/28/200711/28/2007PPASS
DetailsTroy James
Final11/28/200711/28/200711/28/2007PPASS
DetailsTroy James
Final11/27/200711/27/200711/27/2007PFAIL
DetailsTroy James
fire dampers - corridors 1st floor Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
framing not completed at couple of fsd and grease duct needs to be extended and fire wrapped out of wall
Final11/6/200711/6/200711/6/2007AFAIL
DetailsTroy James
need some straps to flex duct and fix angles at fsd 6th floor
Final11/2/200711/2/200711/2/2007ACANC
DetailsTroy James
partial final - corridors only Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
need to reschedule for next week when travis can meet me on site
MEC-Aging Inspection10/1/200710/1/200710/1/2007 PASS
DetailsDixie Fellows
wip
MEC-Aging Inspection7/31/20077/31/20078/6/2007 PASS
DetailsDixie Fellows
wip
Rough-in5/30/20075/31/20075/31/2007APART
DetailsDixie Fellows
grease duct wrap...duct wrap complete.ok to cover
Rough-in5/29/20075/30/20075/30/2007APART
DetailsDixie Fellows
final inspection for grease duct Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
Conference5/16/20075/17/20075/17/2007APASS
DetailsDixie Fellows
###-#### travis..will meet travis fri am to look at listings
Rough-in5/14/20075/16/20075/16/2007ANR
DetailsDixie Fellows
Fire wrap - 2nd layer Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen..waiting on info about listing on wrap
Rough-in5/8/20075/9/20075/9/2007APART
DetailsDixie Fellows
grease duct inspect - first wrap of remaining duct Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen..ok to put 2nd layer of wrap floors 3-6
Rough-in4/30/20075/1/20075/1/2007APASS
DetailsDixie Fellows
grease duct inspection Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
Rough-in4/13/20074/17/20074/17/2007APART
DetailsDixie Fellows
GREASE DUCT - 2ND LAYER Phone #: ###-####..need band on bottom section between 1st and 2nd floor..tape up loose ends
Rough-in4/11/20074/12/20074/12/2007APART
DetailsDixie Fellows
Grease Duct Inspection - 1st 20'' 1st layer Phone #: ###-####...1st layer of duct wrap in shaft ok
Rough-in4/4/20074/5/20074/5/2007APART
DetailsDixie Fellows
grease duct Phone #: ###-####---met with travis to discuss duct-wrapping part of the grease duct so they can build the shaft around it. ok to put on first layer, call for inspection and then install 2nd layer..dixie
Rough-in3/5/20073/6/20073/6/2007APEND
DetailsDixie Fellows
grease duct inspection Phone #: ###-####...1st access ok..waiting to find out if they are going to move them into the stairwell.
Rough-in2/22/20072/23/20072/23/2007APART
DetailsDixie Fellows
Rough-in /Travis Phone #: ###-####..partial grease duct inspection..travis will cut in the access doors and re-call and i will check the inside welds again at each opening
Conference2/21/20072/22/20072/22/2007APASS
DetailsDixie Fellows
Travis - Cover Phone #: ###-####..weekly check ok..travis will schedule a r/i for fri am and i will inspect some grease duct
Conference1/31/20072/1/20072/1/2007APASS
DetailsDixie Fellows
Weekly Confrence Rough in Corridor Phone #: ###-####..
Rough-in1/16/20071/17/20071/17/2007APART
DetailsDixie Fellows
Grease Duct Inspection Phone #: ###-####...looked at 4 sections of grease duct all ok
Conference1/16/20071/16/20071/16/2007PPASS
DetailsDixie Fellows
Conference Phone #: ###-####..met with dave and travis along with forest (fire inspector and discussed fire protection) dave will call for grease duct inspection for wednesday
Conference1/9/20071/11/20071/11/2007APART
DetailsDixie Fellows
Conference w/ Dave Tully Phone #: ###-####..DAVE WILL RESCHEDULE AND WE WILL MEET WITH FOREST TUES AM 9:30