Final | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PASS |
Troy James
|
|
|
###-#### bj thank you
|
Rough-in | 1/24/2007 | 1/24/2007 | 1/24/2007 | P | PART |
Lee Rice
|
|
|
bj 5730755 access to roof (pressure test) and space is in the back of the building....ducts ok t, call back in when grid and difusers are in.
|
Pressure Test | 1/24/2007 | 1/24/2007 | 1/24/2007 | P | CANC |
Lee Rice
|
|
|
bj 5730755 access to roof (pressure test) and space is in the back of the building ......passed gas test yesterday
|
Pressure Test | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | PASS |
Lee Rice
|
|
|
BJ ###-#### WILL HAVE TO ACCESS ROOF LADDER AT BACK OF BUILDING ON TOP OF 2ND FLOOR BALCONY,TO SEE THE GAUGE......... .60psi ok
|
Rough-in | 1/23/2007 | 1/23/2007 | 1/23/2007 | P | FAIL |
Lee Rice
|
|
|
BJ ###-#### no access
|