Final | 6/14/2007 | 6/15/2007 | 6/15/2007 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 3/20/2007 | 3/20/2007 | 3/20/2007 | A | PASS |
Troy James
|
|
|
|
Pressure Test | 3/19/2007 | 3/20/2007 | 3/20/2007 | A | PASS |
Troy James
|
|
|
gas will be pumped up in the early am so go ahead and inspect Phone #: ###-#### 20# test
|
Rough-in | 3/19/2007 | 3/19/2007 | 3/19/2007 | P | FAIL |
Troy James
|
|
|
ext 111 rough re inspect Phone #: ###-#### pressure test failed
|
Rough-in | 3/5/2007 | 3/5/2007 | 3/5/2007 | P | FAIL |
Troy James
|
|
|
ext 111 to call linda if you have questions builder needs gas and rough inspect but will have equiptment installed before the final mech inspection. Phone #: ###-#### c/n posted on fireplace
|