Final | 10/8/2007 | 10/9/2007 | 10/9/2007 | A | PASS |
Dixie Fellows
|
|
|
leo - re-inspection Phone #: ###-####
|
Final | 10/5/2007 | 10/8/2007 | 10/8/2007 | A | FAIL |
Dixie Fellows
|
|
|
leo - re-inspection Phone #: ###-####...corrections not done..reinspection fee
|
Final | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | FAIL |
Dixie Fellows
|
|
|
leo Phone #: ###-#### call for access..posted corrections at furnace and talked to contractor
|
Final | 9/26/2007 | 9/27/2007 | 9/27/2007 | P | CANC |
Dixie Fellows
|
|
|
leo Phone #: ###-#### call for access
|
Pressure Test | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 7:55:07 AM. Contact: ###-####.
|
Rough-in | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Dixie Fellows
|
|
|
leo; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles...r/i ok-gas failed..leak
|