Final | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims
|
Rough-in | 3/13/2007 | 3/13/2007 | 3/13/2007 | P | PASS |
Dixie Fellows
|
|
|
###-#### April .r/i and 20lb gas ok
|
Pressure Test | 3/9/2007 | 3/12/2007 | 3/12/2007 | A | PASS |
Dixie Fellows
|
|
|
parcel hold has nothing to do with mec..20lb ok
|
Rough-in | 3/9/2007 | 3/12/2007 | 3/12/2007 | A | FAIL |
Dixie Fellows
|
|
|
parcel hold has nothing to do with mec rough in..need to either pan off or shield b-vent from r/a duct in chase..does the furnace manuf require a min of 5' from the furn to the termination, and a 1/4" slope per foot? gas ok..it looked like there might be a screw penetrating the inner liner of the b-vent but i couldn't tell for sure..(poor eyesight ya know)..thanks
|