Final | 6/6/2007 | 6/7/2007 | 6/7/2007 | A | PASS |
Dixie Fellows
|
|
|
House will be open. A/C will not be set per builder - he is waiting for stucco to be finished. Phone #: ###-#### Internet Inspection Request from: Wade Huskey
|
Rough-in | 3/19/2007 | 3/19/2007 | 3/19/2007 | P | PASS |
Dixie Fellows
|
|
|
shelley; Phone #: ###-#### Internet Inspection Request from: Victoria Beall..r/i and 20lb gas ok
|
Pressure Test | 3/14/2007 | 3/15/2007 | 3/15/2007 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-####...leak
|
Rough-in | 3/14/2007 | 3/15/2007 | 3/15/2007 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-####..complete w/h venting..gas failed
|