Final | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PASS |
Dixie Fellows
|
|
|
meet chad after his meeting ###-####
|
Final | 6/21/2007 | 6/21/2007 | 6/21/2007 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/21/2007 at 8:30:02 AM. Contact: ###-####....will meet chad fri am
|
Final | 6/12/2007 | 6/12/2007 | 6/12/2007 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/12/2007 at 10:56:26 AM. Contact: ###-####...ok for ceiling tile
|
Final | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/15/2007 at 12:25:53 PM. Contact: ###-####...ok to drop tile except at 13 heat pumps
|
Rough-in | 5/2/2007 | 5/3/2007 | 5/3/2007 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/2/2007 at 12:21:30 PM. Contact: ###-####...ok to cover hard lids on main level
|
Rough-in | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/12/2007 at 11:58:40 AM. Contact: ###-####...all ductwork on 1st and 2nd floor (bank) ok and ready to insulate
|