Final | 1/22/2008 | 1/23/2008 | 1/23/2008 | A | PASS |
Bill VanDegrift
|
|
|
mike ###-####...bldg 1
|
Final | 1/18/2008 | 1/22/2008 | 1/22/2008 | P | PEND |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Smith...rescheduled for wed am
|
Final | 1/17/2008 | 1/18/2008 | 1/18/2008 | P | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Mike Smith Inspection cancelled from web by: Mike Smith
|
MEC-Aging Inspection | 1/11/2008 | 1/11/2008 | 1/11/2008 | | PASS |
Bill VanDegrift
|
|
|
|
MEC-Aging Inspection | 10/30/2007 | 10/30/2007 | 10/30/2007 | | PASS |
Bill VanDegrift
|
|
|
wip
|
MEC-Aging Inspection | 8/29/2007 | 8/29/2007 | 8/30/2007 | | PASS |
Dixie Fellows
|
|
|
wip
|
Rough-in | 6/25/2007 | 6/26/2007 | 6/26/2007 | A | PASS |
Dixie Fellows
|
|
|
mark - re-inspection Phone #: ###-####...bldg 1 ok for cover
|
Rough-in | 6/22/2007 | 6/25/2007 | 6/25/2007 | A | PART |
Dixie Fellows
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
Rough-in | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | FAIL |
Dixie Fellows
|
|
|
shaun ###-####..posted corrections
|
Conference | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Dixie Fellows
|
|
|
shaun ###-####..discussed job with shawn
|
Rough-in | 5/14/2007 | 5/15/2007 | 5/15/2007 | A | NR |
Dixie Fellows
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Beall..rescheduled for conference for pm to walk the job with the journeyman
|
Conference | 5/11/2007 | 5/14/2007 | 5/14/2007 | A | DONE |
Troy James
|
|
|
MIKE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles dryer venting issues, everything else looks okay
|