Pressure Test | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 9:32:15 AM. Contact: ###-####. 60# test
|
Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/16/2007 at 9:31:09 AM. Contact: ###-####. 60# test
|
Pressure Test | 4/13/2007 | 4/13/2007 | 4/13/2007 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/13/2007 at 8:23:54 AM. Contact: ###-####. gas piping is undersized from the regulator downstream. called about test tees and unions etc. at the regulator.
|
Rough-in | 4/13/2007 | 4/13/2007 | 4/13/2007 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/13/2007 at 8:22:58 AM. Contact: ###-####. gas piping is undersized
|