Final | 11/26/2007 | 11/27/2007 | 11/27/2007 | A | PASS |
Bill VanDegrift
|
|
|
call gary ahead ###-#### Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer final ok
|
Final | 10/8/2007 | 10/9/2007 | 10/10/2007 | P | PART |
Dixie Fellows
|
|
|
please call Gary at ###-#### so he can meet - give him at least 45 mins. notice please. Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer....everything ok except they are waiting on duct detectors (electricians installing them)
|
Rough-in | 9/4/2007 | 9/5/2007 | 9/5/2007 | A | PART |
Dixie Fellows
|
|
|
"cover inspection" for this morning please Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer...ok to cover all shafts
|
Rough-in | 8/30/2007 | 8/30/2007 | 8/31/2007 | P | PASS |
Dixie Fellows
|
|
|
inspect installation of fire dampers before completion of installation Phone #: ###-#### Internet Inspection Request from: Kathy ...checked one s/f damper installation so they can instal the others
|
Pressure Test | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | PASS |
Dixie Fellows
|
|
|
Contact person on jobsite - Lynn Horne Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer.....60lb test from main to drop on all equipment ok
|
Pressure Test | 8/14/2007 | 8/15/2007 | 8/15/2007 | P | PASS |
Dixie Fellows
|
|
|
Contact person on jobsite:Lynn Horne ###-#### Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer
|
Conference | 8/10/2007 | 8/13/2007 | 8/13/2007 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/10/2007 at 8:44:07 AM. Contact: ###-####..met with engineer, tony and hvac contractor to discuss s/f dampers
|
Rough-in | 8/6/2007 | 8/7/2007 | 8/8/2007 | P | PEND |
Dixie Fellows
|
|
|
"cover up" inspection contact person - Lynn Horn at jobsite Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer..i called brian from eng inc as well as tony young to set up a conference to clarify the problems with the s/f dampers. they can't be installed per manuf due to lack of space in existing chase. as soon as they call back i'll call vic to reschedule..thanks dixie
|
Rough-in | 8/2/2007 | 8/3/2007 | 8/3/2007 | P | FAIL |
Troy James
|
|
|
Contact person is Lynn Horn at jobsite. Reinspection of previous request on cover Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer need installation instruction that deal with fsd through floor install and if angles can be installed without the angles completely wrap around damper, installation instruction are vague in this regard
|
Rough-in | 7/30/2007 | 8/1/2007 | 8/1/2007 | A | FAIL |
Dixie Fellows
|
|
|
cover up inspection (several areas) contact person on jobsite: Lynn Phone #: ###-#### Internet Inspection Request from: Kathy Lattimer..all s/f dampers and access doors to be installed per manuf specs..have specs on site at next inspection
|
Pressure Test | 5/14/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Dixie Fellows
|
|
|
vic Note: PARTIAL - cover up; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles..20lb gas to furn 2nd floor ok..ok to cover lid hallway 2nd floor
|
Conference | 5/4/2007 | 5/7/2007 | 5/7/2007 | A | PASS |
Dixie Fellows
|
|
|
gary - fire dampers ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith...met with contractor and tony young to discuss s/f damper placement per engineer. we all agreed to leave as per engineer
|