Final | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Dixie Fellows
|
|
|
contact home-owner
|
Pressure Test | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Dixie Fellows
|
|
|
peter Phone #: ###-####
|
Rough-in | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | PART |
Dixie Fellows
|
|
|
peter - ###-#### ....ok for cover
|
Pressure Test | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PASS |
Dixie Fellows
|
|
|
mike Phone #: ###-####...60LB U/G GAS FROM METER TO OUT BUILDING OK
|
Pressure Test | 8/1/2007 | 8/2/2007 | 8/2/2007 | A | FAIL |
Dixie Fellows
|
|
|
mike Phone #: ###-####...leak...infill under gas line at meter with sand for support of gas tite
|