Final | 10/22/2007 | 10/23/2007 | 10/23/2007 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 10/10/2007 | 10/11/2007 | 10/11/2007 | A | PASS |
Alan Hauser
|
|
|
2-60#
|
MEC-Aging Inspection | 9/3/2007 | 9/3/2007 | 9/4/2007 | | CANC |
Alan Hauser
|
|
|
|
Pressure Test | 7/2/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Alan Hauser
|
|
|
didn't bother to check guages as i ask, both on zero as their were the other day
|
Rough-in | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PART |
Alan Hauser
|
|
|
duct ok in attic
|
Conference | 5/29/2007 | 5/30/2007 | 5/30/2007 | A | PART |
Bill VanDegrift
|
|
|
ext 111 rough in re inspect with walk through with the rough in crew corrections have been made / please call me when you will be 30 minutes out so I can get the crew there for walk thru. Phone #: ###-#### Internet Inspection Request from: LINDA DORN went over incomplete job, same as the other ri's in the project.
|
Rough-in | 5/30/2007 | 5/30/2007 | 5/30/2007 | P | PART |
Bill VanDegrift
|
|
|
ext 111 rough in re inspect with walk through with the rough in crew corrections have been made / please call me when you will be 30 minutes out so I can get the crew there for walk thru. Phone #: ###-#### Internet Inspection Request from: LINDA DORN supply and return in chase only no furace venting to the basement or ductwork in the ceiling.
|
Pressure Test | 5/30/2007 | 5/30/2007 | 5/30/2007 | P | PASS |
Bill VanDegrift
|
|
|
ext 111 rough in re inspect with walk through with the rough in crew corrections have been made / please call me when you will be 30 minutes out so I can get the crew there for walk thru. Phone #: ###-#### Internet Inspection Request from: LINDA DORN 2-60# tests ok
|
Rough-in | 5/24/2007 | 5/25/2007 | 5/25/2007 | A | FAIL |
Bill VanDegrift
|
|
|
ext 111 Phone #: ###-#### Internet Inspection Request from: LINDA DORN duct work incomplete. insulation shield required on water heater b-vent. gas tests failed.
|