Final | 8/28/2007 | 8/29/2007 | 8/29/2007 | P | PASS |
Dixie Fellows
|
|
|
Please do mechanical final inspection. Please call for access. Thank You! Phone #: ###-#### Internet Inspection Request from: Donnette Ellis
|
Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PASS |
Dixie Fellows
|
|
|
Please do mechanical rough in reinspection and gas pressure witness test. Thank You! Phone #: ###-#### Internet Inspection Request from: Donnette Ellis...20lb gas ok
|
Rough-in | 6/14/2007 | 6/15/2007 | 6/15/2007 | A | FAIL |
Dixie Fellows
|
|
|
Please do gas pressure witness test with mechanical rough in inspection. Thank You! Phone #: ###-#### Internet Inspection Request from: Donnette Ellis...posted corrections...need 1" gas to furn and wh
|