Final | 5/7/2008 | 5/7/2008 | 5/7/2008 | P | PASS |
Troy James
|
|
|
craig - please call for access Phone #: ###-####
|
Final | 5/2/2008 | 5/5/2008 | 5/5/2008 | A | FAIL |
Troy James
|
|
|
craig - please call 1/2 to 45 minutes prior so that he can meet you there Phone #: ###-#### informed contractor what the previous c/n was
|
Final | 2/29/2008 | 3/4/2008 | 3/4/2008 | A | FAIL |
Troy James
|
|
|
craig Note: please call for access Phone #: ###-#### c/n posted at unit 2251
|
MEC-Aging Inspection | 1/28/2008 | 1/28/2008 | 1/28/2008 | | CANC |
Troy James
|
|
|
|
MEC-Aging Inspection | 11/27/2007 | 11/27/2007 | 11/27/2007 | | CANC |
Troy James
|
|
|
|
MEC-Aging Inspection | 9/27/2007 | 9/27/2007 | 9/27/2007 | | CANC |
Troy James
|
|
|
wip
|
Rough-in | 7/6/2007 | 7/6/2007 | 7/6/2007 | P | PASS |
Bill VanDegrift
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang 5 east units ri ok 5- 60# tests ok
|
Rough-in | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | FAIL |
Bill VanDegrift
|
|
|
craig; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang ri for 5 east units. screws through b-vent inner liner through out, replace with new. provide dryer makeup air. two east unit gas test guages are bad. replace and retest.
|
Rough-in | 6/13/2007 | 6/13/2007 | 6/13/2007 | P | PART |
Troy James
|
|
|
###-####- craig ok the first 5 units starting from the west
|