Final | 9/27/2007 | 9/28/2007 | 9/28/2007 | A | PASS |
Alan Hauser
|
|
|
|
Final | 9/26/2007 | 9/27/2007 | 9/27/2007 | A | FAIL |
Alan Hauser
|
|
|
no access, locked
|
Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 | P | PASS |
Alan Hauser
|
|
|
|
Rough-in | 6/28/2007 | 6/29/2007 | 6/29/2007 | A | FAIL |
Alan Hauser
|
|
|
pt ok 20#, finish framing at 2nd floor flue
|