Final | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Alan Hauser
|
|
|
|
Pressure Test | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | PASS |
Alan Hauser
|
|
|
20#
|
Rough-in | 7/27/2007 | 7/30/2007 | 7/30/2007 | A | PART |
Alan Hauser
|
|
|
r/i ok, still need pt
|
Rough-in | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | FAIL |
Alan Hauser
|
|
|
permit all work done. gas, furn. and venting. need insulation sheild at flue
|