Final | 11/20/2007 | 11/20/2007 | 11/20/2007 | P | PASS |
Bill VanDegrift
|
|
|
Sandy Phone #: ###-####
|
Rough-in | 6/27/2007 | 6/27/2007 | 6/27/2007 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/27/2007 at 9:22:18 AM. Contact: ###-####.
|
Conference | 6/21/2007 | 6/22/2007 | 6/22/2007 | A | PASS |
Dixie Fellows
|
|
|
wayne Phone #: ###-####..met with wayne to discuss corrections..he will call lee and talk to him about the duct work...air connector used not flex duct
|
Pressure Test | 6/21/2007 | 6/21/2007 | 6/22/2007 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/21/2007 at 7:46:50 AM. Contact: ###-####.
|
Rough-in | 6/21/2007 | 6/21/2007 | 6/22/2007 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/21/2007 at 7:45:14 AM. Contact: ###-####.
|